TCH-Ryan Posted July 3, 2008 Posted July 3, 2008 We will be conducting scheduled maintenance on Saturday the 5th of July through the morning of Sunday the 6th beginning at 11:00PM to 03:00AM EST (-0500), although we do not expect any prolonged downtime it is likely there will be roughly 5 minutes of visible downtime. This maintenance window is to put our new catalyst 6509 router/switch back into production after the conclusion of a 2 week burn-in phase to adequately test the replaced hardware which previously failed on it ( http://www.totalchoicehosting.com/forums/i...mp;#entry225805 ). Although we are confident in the new hardware, it is never easy to reproduce production loads in a controlled environment. As such, despite the extended burn-in phase we have put it through, the real trial will be when we flip it back into production. We will provide more updates as soon as they become available.
TCH-Ryan Posted July 6, 2008 Author Posted July 6, 2008 We will be proceeding as scheduled with the maintenance in 5 minutes, further updates will be posted as they are available.
TCH-Ryan Posted July 6, 2008 Author Posted July 6, 2008 The switch over has been completed without issue, we will continue to monitor the new hardware in the coming days to ensure there is no recurring issues. Thank you for your patience while we have worked to resolve this situation.
Recommended Posts