Jump to content


Photo

Level(3) Network Maintenance


  • This topic is locked This topic is locked
No replies to this topic

#1 TCH-James

TCH-James

    Immediate Family

  • Members
  • PipPipPipPip
  • 404 posts

Posted 20 December 2007 - 08:58 PM

Greetings TCH Family,

We have been informed that there will be maintenance performed on two DWDM ring nodes which provide our facility with Level(3) transit. The maintenance window is set to begin at 2:00AM EST December 22nd and ending 3:00AM EST December 22nd.

There will be a brief interruption in reachability to Level(3) connected networks during this window. The interruption is not expected to last more than 30 seconds while our system reroutes this traffic and only traffic destined to or originating from Level(3) connected networks will be affected. For a period of approximately 30 minutes Level(3) connected networks will be routed through our two other peers, XO and Cogent. The maintenance being performed is meant to improve reliability of traffic on this circuit.




1 user(s) are reading this topic

0 members, 1 guests, 0 anonymous users